CROME First operational installation that was used for the LBE Run

First operational installation at Linac 4 / PSB Injectors
Since 2019, more than 150 have been installed at the PSB, PS, SPS, SM18, LHC-UPRs and the North-Area.


CROME First operational installation that was used for the LBE Run
First operational installation at Linac 4 / PSB Injectors
Since 2019, more than 150 have been installed at the PSB, PS, SPS, SM18, LHC-UPRs and the North-Area.