CROME First operational installation that was used for the LBE Run
![PAX102 CROME au PS](/sites/default/files/inline-images/PAXB102_CROME.png)
First operational installation at Linac 4 / PSB Injectors
Since 2019, more than 150 have been installed at the PSB, PS, SPS, SM18, LHC-UPRs and the North-Area.
![Hamza Boukabache](/sites/default/files/inline-images/CROME_DEP.png)
![Hamza Boukabache](/sites/default/files/inline-images/CROME-DEP2.png)
CROME First operational installation that was used for the LBE Run
First operational installation at Linac 4 / PSB Injectors
Since 2019, more than 150 have been installed at the PSB, PS, SPS, SM18, LHC-UPRs and the North-Area.