CROME Acceptance Tests at SM18 were successful

SM18 is the first complexe pilote zone for the full CROME system. SM18 has :

  • CROME CMPU racks and bulks
  • CROME Junction Box (CJB) interfaced with both the access and the interlocking system
  • Alarm units
  • CROME UPS rack and wall

The tests simulated various scenarios including alarms triggering and interlocks generations.

SM18_CROME
SM18
CROME