Operation

CROME First operational installation that was used for the LBE Run

PAX102 CROME au PS

First operational installation at Linac 4 / PSB Injectors

Since 2019, more than 150 have been installed at the PSB, PS, SPS, SM18, LHC-UPRs and the North-Area.

Hamza Boukabache
Hamza Boukabache